Skip to main content

Pilon Engineering

Depolymerization manufacturer in Qatar

Custom Depolymerization Plants & Chemical Recycling Skids for Qatar

In order to promote Qatar National Vision 2030 sustainable development objectives, zero-waste policies, and circular plastic economies within Ras Laffan Industrial City, Mesaieed Industrial City, Dukhan, and Doha, Pilon Engineering Pvt. Ltd. provides bespoke depolymerization reactors, catalytic solvolysis skids, and thermal chemical recycling plants. Designed for the unique needs of Qatar-based petrochemical firms, consortiums, and resource management companies, our flexible skids allow for precise depolymerization of post-industrial and post-consumer plastics such as PET (glycolysis/methanolysis), PMMA, Polycarbonate (PC), Polyamides (Nylon), and polyolefins into pristine monomers or recycled oil feedstocks. All of our skids have been constructed using ASME Section VIII pressure vessels, multi-zoned thermal control units, automated monomer purification circuits, and Siemens/Yokogawa PLC-SCADA control systems, allowing for operation in extremely arid environmental temperatures beyond +50°C. Every skid complies with Qatargas/QatarEnergy safety guidelines, explosion-proof (Ex-d/Ex-i) regulations, and complete Factory Acceptance Testing (FAT) prior to site delivery.

Depolymerization manufacturer in Japan, South Korea, UK, Saudi Arabia, Kuwait, Qatar, UAE, Oman, US, Germany, India

Pilon Engineering Pvt. Ltd. is a Depolymerization manufacturer that makes machines to turn plastic waste into fuel. We use heat and special stuff to break down the plastic and give it a new use. We don’t just build machines; we set up the whole plant for our clients. This helps cut down on waste and keeps our planet clean. Our goal is to turn plastic trash into something good while we take care of the earth.

Why Pick Us?

Our machines fit your needs. They handle your waste type and amount.

Our tech is clean. It turns waste into fuel oil, gas, and carbon black.

We do a lot of research. We keep making our systems better.

Our units are safe. They meet rules that keep the earth clean.

We give full service. We design, build, set up, and fix the plants.

We help here and abroad. Our reach is world-wide.

Our team knows the job. They have a lot of know-how in waste work.

Uses of Our Tech:

Turn plastic into fuel

Recycle plastic waste

Manage town and factory waste

Help make a reuse economy

Get back useful stuff from petro goods

Our Depolymerization Solutions Include:

PET and Polyester Depolymerization Systems

Nylon Depolymerization Plants

Mixed Plastic Waste Depolymerization Units

Pilot Plants for Research

Custom Reactors and Tools

Start your plastic recycling business or upgrade your waste setup. 

Frequently Asked Questions (FAQs)

Q: Which industrial cities and recycling corridors in Qatar does Pilon Engineering support?

A: We deliver modular depolymerization skids and chemical recycling demonstration units across Qatar’s primary industrial zones, including Ras Laffan Industrial City, Mesaieed Industrial City, Dukhan, Umm Said, and Doha industrial belts.  

Q: What polymer depolymerization pathways do Pilon Engineering skids support?

A: Our process skids support PET glycolysis, methanolysis, and hydrolysis to BHET/DMT/TPA; PMMA thermal/catalytic depolymerization back to MMA monomer; Polycarbonate (PC) solvolysis; Nylon 6/66 depolymerization to caprolactam; and hydrothermal/catalytic degradation of mixed polyolefins into recycled oil feedstock.

Q: How are Pilon Engineering depolymerization skids optimized for Qatar’s extreme climate?

A: Skids are fabricated using high-grade corrosion-resistant metallurgy (SS316L, Hastelloy C-276, Inconel) and outfitted with IP66/NEMA 4X rated control enclosures, solar radiation shielding, heavy-duty thermal insulation, and dual-redundant fluid cooling loops designed for continuous operation above +50°C.

Q: Does Pilon Engineering execute Factory Acceptance Testing (FAT) before export to Qatar?

A: Yes. Every skid undergoes full off-site FAT at our manufacturing facility, including hydrostatic pressure validation, helium leak testing, electrical loop checks, and automated safety interlock verification prior to shipment.

Contact Us

Pilon Engineering Pvt. Ltd. is the partner you need. Let’s turn waste into wealth and make the earth cleaner and greener.

Primary Responsibilities :
  1. 1.Making Drawing for Pressure Vessel, column, Heat Exchanger etc.
  2. 2.Making Dosing System Drawing as per client P &ID.
  3. 3.Having Experience in EPC Project
  4. 4.Designing of Manufacturing components, Assembly, GA drawing and assembly of project
Key Result Areas :
  1. 1.Work with multiple discipline projects
  2. 2.Managing and monitoring all assigned Projects
  3. 3.Site Engineering, Project Management
  4. 4.Documents Management
  5. 5.Subordinate and Senior Relations
  6. 6.Work within Time and Accuracy (No any complaints)
  7. 7.Discipline on Office (Proper Dress up, Appearance, Duty Timings, Communication)
Reporting to : Respective Line Manager
Primary Responsibilities :
  1. Preparation of Project Planning & Scheduling, Attending project Kick off meetings.
  2. One point contact to customer.
  3. Act as main coordination between Customer, Factory, and Supplier.
  4. Monitor the overall progress of projects against schedule and reporting to management.
  5. Maintain detailed project files and applicable records.
  6. coordinate the assigned project work during all project phases
  7. Manage budget, procurement and schedules for various projects.
  8. Provide approved documents along with manufacturing schedule based on the Commercial situation, inventory & time frame to the factory & supplier.
  9. Follow-up with supplier & factory for manufacturing status.
  10. Provide the project progress status to customer & management.
  11. Coordination of the inspection activity with factory, supplier, customer & TPI as per customer requirements
Key Result Areas :
  1. Work with multiple discipline projects
  2. Managing and monitoring all assigned Projects
  3. Site Engineering, Project Management
  4. Documents Management
  5. Subordinate and Senior Relations
  6. Work within Time and Accuracy (No any  complaints)
  7. Discipline on Office (Proper Dress-up, Appearance, Duty Timings, Communication)
Reporting to : Respective Line Manager
  • Having experience in EPC projects.
  • Having knowledge of exposure to pressure vessels, various types of process equipment, skid mounted systems is must.
  • Hould be able to prepare GA Drawings, Detailed fabrication drawings to support manufacturing .
  • Assembly of Shell & Tube Heat Exchangers, reactors, pressure vessels, skid, piping/ tubing etc
  • Should have experience of Preparation of Pipeline drawing – PFD / PID
  • Preparation of GAD/ layouts for projects.
  • Having experience in EPC projects.
  • Having knowledge of exposure to pressure vessels, various types of process equipment, skid mounted systems is must.
  • hould be able to prepare GA Drawings, Detailed fabrication drawings to support manufacturing .
  • Assembly of Shell & Tube Heat Exchangers, reactors, pressure vessels, skid, piping/ tubing etc
  • Should have experience of Preparation of Pipeline drawing – PFD / PID
  • Preparation of GAD/ layouts for projects.
  • Conducting product research and sourcing new suppliers and vendors.
  • Sourcing materials, goods, products, and services and negotiating the best or most cost-effective contracts and deals.
  • Performing inventory inspections and reordering supplies and stock as necessary.
  • Conducting market research to keep abreast of emerging trends and business opportunities.
  • Updating and maintaining records of all orders, payments, and received stock.
  • Excellent networking and time management skills.