Uncompromised Design

Compromise in Design and Component
failure is not an option for Pilon

Our systems run 24X7 often running at elevated pressures and temperatures or in corrosive environments the whole year.
Our systems run 24X7 often running at elevated pressures and temperatures or in corrosive environments the whole year.
Our customers need speed and excellency of the products along with confidence and reliability on performance fronts. Hence, we do not compromise on selection of hardware and softwares for our systems.
Hence collaborations with them and integration of their products in our systems is always a fruitful investment.

If a component in our unit fails it can potentially set down a unit. Which means either the experiment has to be stopped or the experiment, its feeds | Catalysts are destroyed. For times when processes and experiments | trials tend to extend for a longer duration, component failures may be disastrous and not acceptable for the process itself.
You may, if experiment fails; throw away the results and restart if system is good but if system fails it calls for immediate replacements and for components having longer lead times, wastage of time and non-productive phase can be a major setback for any R&D.

Including quality products in our systems ultimately makes our system standard, robust and more reliable. Our suppliers like Swagelok | TKF, Equilibar, Brooks | Bronkhorst, | Sandvik, Badger Meter, Ritter, ATS, Tescom etc. have since years developed quality and reliable products and have proved their existence to be worth for the R&D needs.
Primary Responsibilities :
  1. 1.Making Drawing for Pressure Vessel, column, Heat Exchanger etc.
  2. 2.Making Dosing System Drawing as per client P &ID.
  3. 3.Having Experience in EPC Project
  4. 4.Designing of Manufacturing components, Assembly, GA drawing and assembly of project
Key Result Areas :
  1. 1.Work with multiple discipline projects
  2. 2.Managing and monitoring all assigned Projects
  3. 3.Site Engineering, Project Management
  4. 4.Documents Management
  5. 5.Subordinate and Senior Relations
  6. 6.Work within Time and Accuracy (No any complaints)
  7. 7.Discipline on Office (Proper Dress up, Appearance, Duty Timings, Communication)
Reporting to : Respective Line Manager
Primary Responsibilities :
  1. Preparation of Project Planning & Scheduling, Attending project Kick off meetings.
  2. One point contact to customer.
  3. Act as main coordination between Customer, Factory, and Supplier.
  4. Monitor the overall progress of projects against schedule and reporting to management.
  5. Maintain detailed project files and applicable records.
  6. coordinate the assigned project work during all project phases
  7. Manage budget, procurement and schedules for various projects.
  8. Provide approved documents along with manufacturing schedule based on the Commercial situation, inventory & time frame to the factory & supplier.
  9. Follow-up with supplier & factory for manufacturing status.
  10. Provide the project progress status to customer & management.
  11. Coordination of the inspection activity with factory, supplier, customer & TPI as per customer requirements
Key Result Areas :
  1. Work with multiple discipline projects
  2. Managing and monitoring all assigned Projects
  3. Site Engineering, Project Management
  4. Documents Management
  5. Subordinate and Senior Relations
  6. Work within Time and Accuracy (No any  complaints)
  7. Discipline on Office (Proper Dress-up, Appearance, Duty Timings, Communication)
Reporting to : Respective Line Manager
  • Having experience in EPC projects.
  • Having knowledge of exposure to pressure vessels, various types of process equipment, skid mounted systems is must.
  • Hould be able to prepare GA Drawings, Detailed fabrication drawings to support manufacturing .
  • Assembly of Shell & Tube Heat Exchangers, reactors, pressure vessels, skid, piping/ tubing etc
  • Should have experience of Preparation of Pipeline drawing – PFD / PID
  • Preparation of GAD/ layouts for projects.
  • Having experience in EPC projects.
  • Having knowledge of exposure to pressure vessels, various types of process equipment, skid mounted systems is must.
  • hould be able to prepare GA Drawings, Detailed fabrication drawings to support manufacturing .
  • Assembly of Shell & Tube Heat Exchangers, reactors, pressure vessels, skid, piping/ tubing etc
  • Should have experience of Preparation of Pipeline drawing – PFD / PID
  • Preparation of GAD/ layouts for projects.
  • Conducting product research and sourcing new suppliers and vendors.
  • Sourcing materials, goods, products, and services and negotiating the best or most cost-effective contracts and deals.
  • Performing inventory inspections and reordering supplies and stock as necessary.
  • Conducting market research to keep abreast of emerging trends and business opportunities.
  • Updating and maintaining records of all orders, payments, and received stock.
  • Excellent networking and time management skills.